Community Properties Revitalization Phase 1 A and 1B
Shoring and bracing of sagging floors in multifamily housing units. Spot footings and floor jacking in 75 buildings
Airfield Security Fence Replacement at Port Columbus International & Rickenbacker Air National Guard Base
Trenching for new perimeter fence approximately 80,000 linear feet
City of Columbus Transportation Division
Various multi-year contracts to install A.D.A. compliant curb ramps at intersections throughout the city of Columbus Ohio. Over 3500 ramps constructed from 1998 to present
Columbus Metropolitan Housing Authority (CMHA)
Rosewind Project (Formerly known as Windsor Terrace)- curbs and roadways constructed in a housing project the was redesigned and redeveloped in the inner city
A privately funded major renovation of a co-op housing complex. Installed new front steps, walks and ear patios at 400 units.
TuttleMall
Work in conjunction with a joint venture with to install site concrete curbs, asphalt paving and right-of-way infrastructure improvements for new shopping mall near Dublin Ohio.
City of Dublin Sidewalk Improvements
Removed and replace concrete walk at various locations throughout the City of Dublin.
DefenseSupplyCenter of Columbus (DSCC)
Performed structural steel column repair by remediation of rusting steel columns.